Function of the SS-01 System
The steel plate with the closed cylinder is set on the manhole opening and installed into the asphalt layer. While the asphalt is still warn, the cylinder is exposed and pulled to the level of the asphalt layer with a hook. Asphalt that is still warm is applied underneath the support ring. The roller afterwards automatically positions the cylinder, which can be moved vertically, at the right height.
After completion of the asphalt layers, the cover of the cylinder will be removed. The drill and excavation technology of the Shark machine makes it possible to drill centrically and automatically excavate the SS-01 System including the asphalt drill core in only about 10 minutes.
| SS-01 installed in the asphalt layer, without cover |
Shark machine after the boring during the excavation of the SS-01 with the drill core |
Installed manhole frame with force-fitted sealing of the work area without surface |
Completely installed manhole frame and cover |
Advantages:
- 100% consolidation of the asphalt layers in the surrounding areas of the manhole cover which will be installed later
- Fast installation of the SS-01 System
- Adaptation of the cylinder through the asphalt layers
- Indication of the middle of a manhole opening by the cylinder
- Centric drilling/milling and excavation of the cylinder cover (e.g. use of street washers) during the installation time of the system
- No bad asphalt rollings in the surrounding areas of the manhole cover which will be installed later
- No unclean ridges caused by compressors
- No displacement of the manhole cover by rolling
- Can accept truck and asphalt machine traffic during the asphalt installation
- No wait time for asphalt installation crews due to installation of manhole frames
- Immediate release to traffic due to closed cylinder at an equal height with the asphalt layer
- No inventory cost due to leasing of the system
Our services for you :
- Leasing of the SS-01 Systems, delivery and pick-up to and from construction site at no cost including clean up and maintenance
- Drilling/milling and dismounting of the SS-01 Systems DN850 and DN1200 mm incl. disposal of the asphalt drill core
- Installation of the manhole frames and covers after the asphalt installation at a precise height. We use fast-hardening, high-strength, flowable and shrink free special mortars and plastoelastic surface materials, which create a force-fitted and waterproof sealing between manhole frame/cover and asphalt surface. Can receive traffic after only 1-2 hours.
- Complete manhole restorations with the SHARK System*
Watch a video of the SS-01 System in action - please wait for the video to load:

Please request further information and our price list at info@mnettekinternational.com or call
Tel: 540-832-0609.
* European Patent